AB have recently completed an alteration to the Wythenshaw Community Housing Group Greenwood Road Depot.
We were contracted to alter an internal office to install shower and changing facilities for the WCHG staff to use at the end of their shift.
We blocked up the internal door and formed a shower area with a bench and worktop and coat hanging. We supplied and fitted a new cubicle door and made all alterations to the water connections and electrical circuits. All plastering and joinery was completed by our joiners and plasterers.
On the outside we cut out a door opening from the main building wall and supplied and fitted a high security access door.
The room was finished off with a non slip floor and washable paint.